Grounded Globally
sales@spirafix.au 0428821005
Simply attach the 5 hole through slot bracket (SA238) to your field shelter - one on each corner. Position your field shelter and drive the solid head anchor (SF50-10-630C) down through the slot in the bracket. Once the anchor collar reaches the bracket the anchor is considered installed. Once you are ready to move your shelter to a new position, simply remove the anchor using an adjustable ratchet leaving the bracket in place and reinstall anchors taking care to protect the anchor head using a manual hammer cap.
Always check for buried services.